What are the limits of the generator operating limit?
Motor generator operation limit '> the conditions under which the limit according to the synchronous motor generator operation limits the' > by the following restrictions: motor generator stator winding temperature rise '> (i.e. apparent power limit), excitation winding temperature rise (i.e. excitation current limit), motor generator rated active power limit,' > '> generator stator motor Department of temperature rise and the static stability limit.
1: voltage and Zhou Bo range within allowable value
2: motor generator '> accident overload ability
3: power factor in the late phase of 0.85 to 0.95, automatic excitation adjustment allows power factor of 1 running
4: no temperature rise test, no more than the nameplate data operation
5: when the phase operation, should meet the conditions of the incoming phase
6: the machine and furnace have no influence on the running defects of the unit
7: the main temperature rise in the allowable value
8: the system stability requirements of the conditions under which the limit according to the synchronous motor generator operation limits the '> by the following restrictions: motor generator stator winding temperature rise' > (i.e. apparent power limit), excitation winding temperature rise (i.e. excitation current limit), motor generator '> rated active power limit, motor generator stator' > at the end of the temperature rise and the static stability limit.
1: Zhou Bo, the voltage changes in the scope of permissible value 2: motor generator '> accident overload capacity 3: power factor in the late phase of 0.85 ~ 0.95, automatic excitation regulator allows the power factor of 1 run 4: no temperature rise test, does not allow more than 5: run the nameplate data of leading phase operation, should comply with the underexcitation condition 6: machine, furnace without affecting operation defects of unit 7: the main temperature rise within the permitted value: 8 system stability requirements