Common knowledge of new diesel generator set maintenance
Check four leakage, surface, starting battery, oil and fuel;
Carry out no-load monthly, no more than 5 minutes;
Unit load test machine is carried out every quarter, and power mutation test is carried out;
According to the running time of the unit and not the regular replacement filter;
To improve the clean room environment, replacing the filter regularly;
Unit replacement parts, overhaul or replacement filter, must be full of trial judge.
Through the full load test machine, the nominal power of the unit is corrected, and the actual situation of the unit is kept in mind, so that the customers can make good use of the running unit and ensure safe use of electricity.
Through the load test machine, the performance index of the unit, to judge the real reason for performance decreasing, and provide scientific basis for whether the replacement filter, reduce maintenance cost.
Through the full load test machine, we can judge whether the expected goal can be achieved after heavy repair.
Through the full load test machine, the long time full load test can effectively remove carbon deposits, prolong the overhaul time of the unit and save the cost.
Through the full load test machine, the unit provides a basis for the scrap time, so that customers reasonable arrangements for the use of diesel generator sets.
Preventive experiment, solve the unit hidden from the bottom up, it is to determine the equipment can continue to put into operation and an important measure to ensure the safe operation of electrical equipment operation and maintenance, is an important part of the work, is to ensure that users of "safety first, prevention, necessary measures to reduce the cost.